1 |
Yassine A A , Mostafa O , Browning T R . Scheduling multiple, resource-constrained, iterative, product development projects with genetic algorithms[J]. Computers & Industrial Engineering, 2017, 107, 39- 56.
|
2 |
Gerk J E V , Qassim R Y . Project acceleration via activity crashing, overlapping, and substitution[J]. IEEE Transaction on Engineering Management, 2008, 55 (4): 590- 601.
doi: 10.1109/TEM.2008.927786
|
3 |
Berthaut F , Pellerin R , Perrier N , et al. Time-cost trade-offs in resource constraint project scheduling problems with overlapping modes[J]. International Journal of Project Organization and Management, 2014, 6 (3): 215- 236.
doi: 10.1504/IJPOM.2014.065259
|
4 |
Bozejko W , Hejducki Z , Uchronski M , et al. Solving resource-constrained construction scheduling problems with overlaps by meta-heuristic[J]. Journal of Civil Engineering and Management, 2014, 20 (5): 649- 659.
doi: 10.3846/13923730.2014.906496
|
5 |
Koyuncu E , Erol R . PSO based approach for scheduling NPD projects including overlapping process[J]. Computers & Industrial Engineering, 2015, 85, 316- 327.
|
6 |
Dehghan R , Hazini K , Ruwanpura J . Optimization of overlapping activities in the design phase of construction projects[J]. Automation in Construction, 2015, 59, 81- 95.
doi: 10.1016/j.autcon.2015.08.004
|
7 |
Greze L , Pellerin R , Leclaire P , et al. A heuristic method for resource-constrained project scheduling with activity overlapping[J]. Journal of Intelligent Manufacturing, 2014, 25 (4): 797- 811.
doi: 10.1007/s10845-012-0719-5
|
8 |
于静, 徐哲, 李洪波. 带有活动重叠的资源受限项目调度问题建模与求解[J]. 系统工程理论与实践, 2015, 35 (5): 1236- 1245.
|
9 |
于静, 徐哲, 谢芳. 活动重叠模式与资源约束下的项目调度优化[J]. 管理科学学报, 2017, 20 (9): 36- 45.
|
10 |
Chu Z , Xu Z , Li H . New heuristics for the RCPSP with multiple overlapping modes[J]. Computers & Industrial Engineering, 2019, 131, 146- 156.
|
11 |
Chu Z , Xu Z , Xie F . Experimental Evaluation of Overlapping strategy for the multimode resource-constrained project scheduling problem[J]. Arabian Journal for Science and Engineering, 2019, 44 (3): 2503- 2517.
doi: 10.1007/s13369-018-3211-5
|
12 |
初梓豪, 徐哲. 活动重叠对缩短资源受限项目工期有效性研究[J]. 系统工程理论与实践, 2019, 39 (9): 2388- 2397.
|
13 |
Christofides N , Alvarez-Valdes R , Tamarit M J . Project scheduling with resource constraints: A branch and bound approach[J]. European Journal of Operational Research, 1987, 29 (5): 262- 273.
|
14 |
Demeulemeester E , Herroelen W . A branch-and-bound procedure for the multiple resource-constrained project scheduling problem[J]. Management Science, 1992, 38 (20): 1803- 1818.
|
15 |
Sprecher A , Hartmann S , Drexl A . An exact algorithm for project scheduling with multiple modes[J]. OR Spektrum, 1997, 19 (3): 195- 203.
doi: 10.1007/BF01545587
|
16 |
Mingozzi A , Maniezzo V , Ricciardelli S , et al. An exact algorithm for the resource-constrai-ned project scheduling based on a new mathematical for mulation[J]. Management Science, 1998, 44, 714- 729.
doi: 10.1287/mnsc.44.5.714
|
17 |
Demeulemeester L E , Vanhoucke M , Herroelen S W . A random network generator for activity-on-the-node networks[J]. Journal of Scheduling, 2003, 6 (1): 17- 38.
doi: 10.1023/A:1022283403119
|