| 1 |
Brauner N, Lehoux-Lebacque V, Celse B, et al. Planification d'expériences dans l'industrie chimique[C]//Colloque de l'Institut de la Production et des organisations Industrielles, 2007: 21-32.
|
| 2 |
BraunerN,FinkeG,Lehoux-LebacqueV,et al.Operator non-availability periods[J].4OR-A Quarterly Journal of Operations Research,2009,7(3):239-253.
doi: 10.1007/s10288-008-0084-6
|
| 3 |
RapineC,BraunerN,FinkeG,et al.Single machine scheduling with small operator-nonavailability periods[J].Journal of Scheduling,2012,15(2):127-139.
doi: 10.1007/s10951-012-0269-x
|
| 4 |
ChenY,ZhangA,TanZ Y.Complexity and approximation of single machine scheduling with an operator non-availability period to minimize total completion time[J].Information Sciences,2013,251,150-163.
doi: 10.1016/j.ins.2013.07.003
|
| 5 |
KacemI,KellererH,SeifaddiniM.Efficient approximation schemes for the maximum lateness minimization on a single machine with a fixed operator or machine non-availability interval[J].Journal of Combinatorial Optimization,2016,32(3):970-981.
doi: 10.1007/s10878-015-9924-4
|
| 6 |
WanL,YuanJ J.Single-machine scheduling with operator non-availability to minimize total weighted completion time[J].Information Sciences,2018,445-446,1-5.
doi: 10.1016/j.ins.2018.03.005
|
| 7 |
ZuoL L,SunZ X,LuL F,et al.Single-machine scheduling with rejection and an operator non-availability interval[J].Mathematics,2019,7(8):668.
doi: 10.3390/math7080668
|
| 8 |
LiD W,LuX W.Two-machine flow shop scheduling with an operator non-availability period to minimize makespan[J].Journal of Combinatorial Optimization,2020,39(4):1060-1078.
doi: 10.1007/s10878-020-00548-6
|
| 9 |
GuptaJ N D,GuptaS K.Single facility scheduling with nonlinear processing times[J].Computers & Industrial Engineering,1988,14(4):387-393.
|
| 10 |
BrowneS,YechialiU.Scheduling deteriorating jobs on a single processor[J].Operations Research,1990,38(3):495-498.
doi: 10.1287/opre.38.3.495
|
| 11 |
ChengT C E,DingQ,LinB M T.A concise survey of scheduling with time-dependent processing times[J].European Journal of Operational Research,2004,152(1):1-13.
doi: 10.1016/S0377-2217(02)00909-8
|
| 12 |
GawiejnowiczS.Time-Dependent Scheduling[M].Berlin:Springer,2008.
|
| 13 |
SunX,GengX N.Single-machine scheduling with deteriorating effects and machine maintenance[J].International Journal of Production Research,2019,57(10):3186-3199.
doi: 10.1080/00207543.2019.1566675
|
| 14 |
LiS S,FanB Q.Single-machine scheduling with proportionally deteriorating jobs subject to availability constraints[J].Asia-Pacific Journal of Operational Research,2012,29(4):1250019.
doi: 10.1142/S0217595912500194
|
| 15 |
GawiejnowiczS.A review of four decades of time-dependent scheduling: Main results, new topics, and open problems[J].Journal of Scheduling,2020,23(1):3-47.
doi: 10.1007/s10951-019-00630-w
|
| 16 |
MosheiovG.Scheduling jobs under simple linear deterioration[J].Computers & Operations Research,1994,21(6):653-659.
|
| 17 |
NgC T,BarketauM S,ChengT C E,et al."Product Partition" and related problems of scheduling and systems reliability: Computational complexity and approximation[J].European Journal of Operational Research,2010,207(2):601-604.
doi: 10.1016/j.ejor.2010.05.034
|
| 18 |
WegenerI.Complexity Theory: Exploring the Limits of Efficient Algorithms[M].Berlin:Springer,2005.
|
| 19 |
SahniS K.Algorithms for scheduling independent tasks[J].Journal of the ACM,1976,23(1):116-127.
doi: 10.1145/321921.321934
|