Operations Research Transactions ›› 2010, Vol. 14 ›› Issue (1): 115-128.
• Original Articles • Previous Articles
ZHU Xue-Jun, CHEN Shu, ZHANG Lian-Sheng
Online:
Published:
Abstract: On basis of the maximum velocity's regularity of a multistage rocket we reform the commonly used mathematical model for the cost problem: the least least propellant plan. We analyze the cost problems for multistage rocket of series type in all cases, and verify the effectivity of the new model by some examples
ZHU Xue-Jun, CHEN Shu, ZHANG Lian-Sheng. An Introduction to the Cost for Multistage Rocket of Series Type[J]. Operations Research Transactions, 2010, 14(1): 115-128.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://www.ort.shu.edu.cn/EN/
https://www.ort.shu.edu.cn/EN/Y2010/V14/I1/115