[1] Cheng T C E. Optimal common due-date with limited completion time deviation [J]. Computers and Operations Research, 1988, 15: 91-96.
[2] Liman S D, Rawaswamy S. Earliness-tardiness scheduling problems with a common delivery window [J]. Operations Research Letters, 1994, 15: 195-203.
[3] Liman S D, Panwalkar S S, Thongmee S. Determination of common due window location in a single machine scheduling problem [J]. European Journal of Operational Research, 1996, 93: 68-74.
[4] Yeung W K, Oguz C, Cheng T C E. Minimizing weighed number of early and tardy jobs with a common due window involving location penalty [J]. Annals of Operations Research, 2001, 108: 33-54.
[5] Yeung W K, Oguz C, Cheng T C E. Single machine scheduling with a common due window [J]. Computers and Operations Research, 2001, 28: 157-175.
[6] Chen Z L. Scheduling and common due date assignment with earliness tardiness penalties and batch delivery costs [J]. European Journal of Operational Research, 1996, 93: 49-60.
[7] Shabtay D. Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs [J]. International Journal of Production Economics, 2010, 123: 235-242.
[8] Yin Y Q, Cheng T C E, Wang J Y, et al. Single-machine commom due window assignment and scheduling to minimize the total cost [J]. Discrete Optimization, 2013, 10: 42-53.
[9] Yin Y Q, Cheng T C E, Hsu C J, et al. Single-machine batch delivery scheduling with an assignable commom due window [J]. Omega, 2013, 41: 216-225.
[10] 张玉忠, 张龙. 优化交货期窗口的两阶段供应链排序问题 [J]. 运筹学学报, 2016, 20(4): 30-38. |