Two-agent scheduling on an unbounded parallel-batching machine to minimize maximum cost and makespan
HE Cheng, HAN Xinxin
Operations Research Transactions . 2018, (3): 109 -116 .  DOI: 10.15960/j.cnki.issn.1007-6093.2018.03.011