Two-stage supply chain scheduling with a limited holding time

Expand
  • 1. Institute of Operations Research, School of Management, Qufu Normal University, Rizhao 276826, Shandong,  China

Received date: 2017-03-30

  Online published: 2017-06-15

Abstract

We investigate a two-stage supply chain scheduling problem in which jobs have the holding time which is limited by a constant. A job which is processed completely by the machine needs to dispatch with batch to customer by many vehicles, and a job will incur a holding cost if its completion time is earlier than its dispatch date. Each job will incur an early (tardy) penalty if it is early (tardy) with respect to the common due window under a given schedule. The objective is to find the optimal size and location of the window, the optimal dispatch date for each job, as well as an optimal job sequence to minimize a cost function based on earliness, tardiness, holding time, window location, window size, and batch delivery.
We provide the proof of NP-hard for the problem. Then, we consider the case where the unit cost of holding time is not more than the unit cost of tardiness and give a pseudo-polynomial time algorithm for this case.

Cite this article

ZHANG Long . Two-stage supply chain scheduling with a limited holding time[J]. Operations Research Transactions, 2017 , 21(2) : 126 -134 . DOI: 10.15960/j.cnki.issn.1007-6093.2017.02.014

References

[1] Cheng T C E. Optimal common due-date with limited completion time deviation [J]. Computers and Operations Research, 1988, 15: 91-96.
[2] Liman S D, Rawaswamy S. Earliness-tardiness scheduling problems with a common delivery window [J]. Operations Research Letters, 1994, 15: 195-203.
[3] Liman S D, Panwalkar S S, Thongmee S. Determination of common due window location in a single machine scheduling problem [J]. European Journal of Operational Research, 1996, 93: 68-74.
[4] Yeung W K, Oguz C, Cheng T C E. Minimizing weighed number of early and tardy jobs with a common due window involving location penalty [J]. Annals of Operations Research, 2001, 108: 33-54.
[5] Yeung W K, Oguz C, Cheng T C E. Single machine scheduling with a common due window [J]. Computers and Operations Research, 2001, 28: 157-175.
[6] Chen Z L. Scheduling and common due date assignment with earliness tardiness penalties and batch delivery costs [J]. European Journal of Operational Research, 1996, 93: 49-60.
[7] Shabtay D. Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs [J]. International Journal of Production Economics, 2010, 123: 235-242.
[8] Yin Y Q, Cheng T C E, Wang J Y, et al. Single-machine commom due window assignment and scheduling to minimize the total cost [J]. Discrete Optimization, 2013, 10: 42-53.
[9] Yin Y Q, Cheng T C E, Hsu C J, et al. Single-machine batch delivery scheduling with an assignable commom due window [J]. Omega, 2013, 41: 216-225.
[10] 张玉忠, 张龙. 优化交货期窗口的两阶段供应链排序问题 [J]. 运筹学学报, 2016,  20(4): 30-38.
Outlines

/