An integrated multi-stage supply chain problem with time varying demand, fixed interval orders and different production cycles over a finite planning horizon is considered in this paper. The objective is to find the retailer’s optimal order cycle and devise the manufacturer’s best production strategy to minimize the total operational cost of the supply chain system. The problem is formulated as a mixed integer nonlinear programming model. The model is solved in two steps: to obtain the optimal production strategy for an order cycle and to determine the optimal order cycle. The method of finding the shortest path in graph theory is used in the first step. Algorithms and programs for the two steps are proposed which are proved to be effective by experiments. The influence of each parameter on the optimal solution and the minimum cost is studied by the examples calculated to illustrate the model.
SUN Guanglei, LI Xiaoshen, SHANG Youlin
. Optimal production ordering policy for an integrated supply chain with time varying demand[J]. Operations Research Transactions, 2019
, 23(4)
: 143
-154
.
DOI: 10.15960/j.cnki.issn.1007-6093.2019.04.013
[1] Mohamed Ben-Daya, Mohammed Darwish, Kadir Ertogral. The joint economic lot sizing problem:Review and extensions[J]. European Journal of Operational Research, 2008, 185(2):726-742.
[2] Brahimiabcd N. Single item lot sizing problems[J]. European Journal of Operational Research, 2006, 168(1):1-16.
[3] Glock C H. The joint economic lot size problem:A review[J]. International Journal of Production Economics, 2012, 135(2):671-686.
[4] Naddor E. Inventory Systems[M]. New York:John Wiley, 1966.
[5] Donaldson W A. Inventory replenishment policy for a linear trend in demand-an analytical solution[J]. Journal of the Operational Research Society, 1977, 28(3):663-670.
[6] Hollter R H, Mak K L. Inventory replenishment policies for deteriorating items in a declining market[J]. International Journal of Production Research, 1983, 21(6):813-836.
[7] Hill R M. Inventory models for increasing demand followed by level demand[J]. Journal of the Operational Research Society, 1995, 46(10):1250-1259.
[8] Teng J T, Min J, Pan Q. Economic order quantity model with trade credit financing for non-decreasing demand[J]. Omega, 2012, 40(3):328-335.
[9] 张玉忠, 柏庆国. 碳税政策下时变需求依赖库存与价格的供应链协调模型[J]. 运筹学学报, 2017, 21(2):1-12.
[10] Goyal S K, Girib B C. The production-inventory problem of a product with time varying demand, production and deterioration rates[J]. European Journal of Operational Research, 2003, 147(3):549-557.
[11] Omar M, Sarker R, Othman W A M. A just-in-time three-level integrated manufacturing system for linearly time-varying demand process[J]. Applied Mathematical Modelling, 2013, 37(3):1275-1281.
[12] Diponegoro A, Sarker B R. Operations policy for a supply chain system with fixed-interval delivery and linear demand[J]. Journal of the Operational Research Society, 2007, 58(7):901-910.
[13] Zhao S T, Wu K, Yuan X M. Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demand[J]. European Journal of Operational Research, 2016, 255(2):364-379.
[14] Sarker B R, Jamal A M M, Wang S. Supply chain models for perishable products under inflation and permissible delay in payment[J]. Computers & Operations Research, 2000, 27(1):59-75.