[1]范静, 鲁习文.机器带不可用时间限制的简单线性恶化供应链排序问题[J].运筹学学报, 2016, 20(4):69-
[2]付亚平, 王洪峰, 黄敏等.设备具有恶化特性的多目标流水车间调度模型与算法[J].系统工程理论与实践, 2016, 36(11):2941-
[3]Wang T, Roberto B, Lim A, et al.A branch-and-price algorithm for scheduling of deteriorating jobs and flexible periodic maintenance on a single machine[J].European Journal of Operational Research, 2018, 271(2):826-
[4]Woo Y B, Jung S, Kim B S.A rule-based genetic algorithm with an improvement heuristic for unrelated parallel machine scheduling problem with time-dependent deterioration and multiple rate-modifying activities[J]., 2017, 109:179--190., 109(1):179-190
[5]Woo Y B, Kim B S.Matheuristic approaches for parallel machine scheduling problem with time-dependent deterioration and multiple rate-modifying activities[J].[J]., 2018, 95(2):97-112
[6].
[7] Eduardo L R, VoBS.Modeling the parallel machine scheduling problem with step deteriorating jobs[J]., 2016, 255(1):21-33
[8].
[9]Jafari A A, Lotfi M M.Single machine scheduling to minimize the maximum tardiness under piecewise linear deteriorating jobs[J]. Scientia Iranica E, 2018, 25(1), 370--385.
[10]马卫民, 孙丽, 宁磊等.加工时间带恶化和指数学习效应的成组排序[J].系统工程理论与实践, 2017, 37(1):205-
[11] Luo T B, Zhu Y, Wu W L, Xu Y F, et al.Online makespan minimization in MapReduce-like systems with complex reduce tasks[J].[J]., 2017, 2(11):271-277
[12].
[13].
[14]Huang J D, Zheng F F, Xu Y F, et al.Online MapReduce processing on two identical parallel machines[J].Journal of Combinatorial Optimization, 2018, 35(1):216-223
[15] Ling X, Yuan Y, Wang Dan, et al.Joint scheduling of MapReduce jobs with servers: Performance bounds and experiments[J].
[16]Journal of Parallel and Distributed Computing, 2016, 90(1):52-66.
[17]Li X, Jiang T, Ruiz R, et al.Heuristics for periodical batch job scheduling in a MapReduce computing framework[J].
[18]Information Sciences, 2016, 326(1): 119-133.
[19]Tang S J, Busung L, Bingsheng H.Dynamic Job Ordering and Slot Configurations for MapReduce Workloads[J].
[20]IEEE Transactions on Services Computing, 2016, 9(1){: 4-17.
[21]Shao Y L, Li C L, Gu J G, et al.Efficient jobs scheduling approach for big data applications[J]., 2018, 117(2):249-261
[22].
[23]Shi V Y, Zhang K H, Cui L Z, et al.MapReduce short jobs optimization based on resource reuse[J].
[24]Microprocessors and Microsystems, 2016, 47(1):178-187.
[25]Verma A, Cherkasova L, Campbell R H, et al.Orchestrating an Ensemble of MapReduce Jobs for Minimizing Their Makespan[J].IEEE Transactions on Dependable and Secure Computing, 2013, 10(5):314-327
[26]Mirjalili S, Mirjalili S M, Lewis A.Grey wolf optimizer[J]., 2014, 69(1):46-61
[27]姜天华.混合灰狼优化算法求解柔性作业车间调度问题[J].控制与决策, 2018, 33(3):503-508
[28]姚远远, 叶春明.求解作业车间调度问题的改进混合灰狼优化算法[J].计算机应用研究, 2018, 35(5):1310-
[29]Long W, Jiao J, Liang X, et al.Inspired grey wolf optimizer for solving large-scale function optimization problems[J][J]., 2018, 60:112-126
|