同时最小化最大费用和最大完工时间的双代理无界平行分批排序
何程, 韩鑫鑫
Two-agent scheduling on an unbounded parallel-batching machine to minimize maximum cost and makespan
HE Cheng, HAN Xinxin
运筹学学报 . 2018, (3): 109 -116 .  DOI: 10.15960/j.cnki.issn.1007-6093.2018.03.011