具有服务员工作休假的M/M/1生产库存系统分析
刘文烨, 岳德权
Analysis of M/M/1 production-inventory system with working vacations
Wenye LIU, Dequan YUE
运筹学学报(中英文) . 2025, (4): 1 -13 .  DOI: 10.15960/j.cnki.issn.1007-6093.2025.04.001