单机上一个与总完工时间及最大完工时间相关的工件可拒绝的ND双代理排序问题
葛晴, 录岭法, 原晋江, 张利齐
An ND two-agent scheduling problem with rejection on a single machine related to the total completion time and makespan
Qing GE, Lingfa LU, Jinjiang YUAN, Liqi ZHANG
运筹学学报(中英文)
.
2024, (4): 66
-74
.
DOI: 10.15960/j.cnki.issn.1007-6093.2024.04.006