运筹学

优化交货期窗口的两阶段供应链排序问题

展开
  • 1. 曲阜师范大学管理学院、运筹学研究所, 山东日照 276826

收稿日期: 2016-03-25

  网络出版日期: 2016-12-15

基金资助

国家自然科学基金(No.61340045), 山东省自然科学基金重点项目(No.ZR2015GZ009), 教育部高等学校博士学科点专项基金(No.20123705110003), 山东省属本科高校教学改革研究项目(No.2015M098)

Two-stage supply chain scheduling with an assignable common due window

Expand
  • 1. Institute of Operations Research,  School of Management, Qufu Normal University, Rizhao 276826, Shandong,  China

Received date: 2016-03-25

  Online published: 2016-12-15

摘要

研究一类优化交货期窗口的两阶段供应链排序问题. 优化交货期窗口是指交货期窗口的开始与结束时刻是决策变量, 不是输入常量. 两阶段是指工件先加工, 后运输: 加工阶段是一台加工机器逐个加工工件;运输阶段是无限台车辆分批运输完工的工件. 工件的开始运输时刻与完工时刻之差定义为工件的储存时间, 且有相应的储存费用. 若工件的运输完成时刻早于(晚于)交货期窗口的开始(结束)时刻, 则有相应的提前(延误)惩罚费用. 目标是极小化总提前惩罚费用、总延误惩罚费用、总储存费用、总运输费用以及与交货期窗口有关的费用之和. 针对单位时间的延误惩罚费用不超过单位时间的储存费用、单位时间的储存费用不超过单位时间的提前惩罚费用的情形, 给出了时间复杂性为O(n^{8})的动态规划算法.

本文引用格式

张玉忠, 张龙 . 优化交货期窗口的两阶段供应链排序问题[J]. 运筹学学报, 2016 , 20(4) : 30 -38 . DOI: 10.15960/j.cnki.issn.1007-6093.2016.04.004

Abstract

This paper mainly addresses a two-stage supply chain scheduling problem in which jobs have an assignable common due window. The due window need to be determined, because the start and completion time of the window is a variable instead of a constant. A job which is processed completely by the machine need to be dispatched with batch to customer by many vehicles, and a job will incur a holding cost if its completion time is earlier than its dispatch date. Each job will incur an early (tardy) penalty if it is early (tardy) with respect to the common due window under a given schedule. The objective is to find the optimal size and location of the window, the optimal dispatch date for each job, as well as an optimal job sequence to minimize a cost function based on earliness, tardiness, holding time, window location, window size, and batch delivery. We consider the case where the unit cost of tardiness is not more than the unit cost of holding time, and the unit cost of holding time is not more than the unit cost of earliness. We provide an O(n^{8}) dynamic programming algorithm for this case.

参考文献

[1] Cheng T C E. Optimal common due-date with limited completion time deviation [J]. Computers and Operations Research, 1988, 15: 91-96.
[2] Liman S D, Rawaswamy S. Earliness-tardiness scheduling problems with a common delivery window [J]. Operations Research Letters, 1994, 15: 195-203.
[3] Yeung W K, Oguz C, Cheng T C E. Minimizing weighed number of early and tardy jobs with a common due window involving location penalty [J]. Annals of Operations Research, 2001, 108: 33-54.
[4] Yeung W K, Oguz C, Cheng T C E. Single machine scheduling with a common due window [J]. Computers and Operations Research, 2001, 28: 157-175.
[5] Liman S D, Panwalkar S S, Thongmee S. Common due window size and location determination in a single machine scheduling problem [J]. Journal of the Operational Research Society, 1998, 49: 1007-1010.
[6] Liman S D, Panwalkar S S, Thongmee S. Determination of common due window location in a single machine scheduling problem [J]. European Journal of Operational Research, 1996, 93: 68-74.
[7] Hermann J W, Lee C Y. On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date [J]. European Journal of Operational  Research, 1993, 70: 272-288.
[8] Chen Z L. Scheduling and common due date assignment with earliness tardiness penalties and batch delivery costs [J]. European Journal of Operational Research, 1996, 93: 49-60.
[9] Shabtay D. Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs [J]. International Journal of Production Economics, 2010, 123: 235-242.
[10] Yin Y Q, Cheng T C E, Wang J Y, et al. Single-machine commom due window assignment and scheduling to minimize the total cost [J]. Discrete Optimization, 2013, 10: 42-53.
[11] Yin Y Q, Cheng T C E, Hsu C J, et al. Single-machine batch delivery scheduling with an assignable commom due window [J]. Omega, 2013, 41: 216-225.