运筹学

平行机上带有前瞻区间的不相容工件组在线排序问题

展开
  • 1. 郑州大学数学与统计学院, 郑州 450001;2. 浙江大学经济学院, 杭州 310027

收稿日期: 2014-12-01

  网络出版日期: 2015-12-15

基金资助

1.国家自然科学基金(No. 11171313),
2.河南省教育厅科技研究重点项目(No. 14A110025),
3.郑州大学自主创新项目(No. 14LD00610)

On-line algorithms for incompatible job families on parallel  machines scheduling with lookahead

Expand
  • 1.School of Mathematics and Statistics, Zhengzhou University, Zhengzhou 450001,China; 2.College of Economics, Zhejiang University, Hangzhou 310027, China

Received date: 2014-12-01

  Online published: 2015-12-15

摘要

研究当不相容工件组的个数与机器数相等时,具有前瞻区间的单位工件平行机无界平行分批在线排序问题.工件按时在线到达, 目标是最小化 最大完工时间. 具有前瞻区间是指在时刻t, 在线算法能预见到时间区间(t,t+\beta) 内到达的所有工件的信息.不可相容的工件组是指属于不同组的工件不能被安排在同一批中加工. \beta\geq 1 时, 提供了一个最优的在线算法; 当0\leq \beta < 1时, 提供了一个竞争比为1+\alpha 的最好可能的在线算法, 其中\alpha是方程\alpha^{2}+(1+\beta) \alpha+\beta-1=0的一个正根.最后, 给出了当\beta =0 时稠密算法竞争比的下界,并提供了达到该下界的最好可能的稠密算法.

本文引用格式

李文华, 柴幸, 袁航, 杨素芳 . 平行机上带有前瞻区间的不相容工件组在线排序问题[J]. 运筹学学报, 2015 , 19(4) : 121 -126 . DOI: 10.15960/j.cnki.issn.1007-6093.2015.04.012

Abstract

 We consider the on-line scheduling of incompatible unit-length job families  on unbounded parallel-batch machines with lookahead when the number of
job families is equal to the number of machines. In this paper online means that jobs arrive over time. The objective is to minimize the makespan. In the lookahead model, at a time instant  t , an on-line algorithm can foresee the information of all jobs arriving in the time segment  (t,t+\beta). By incompatible job
families, we  mean that jobs from different families cannot be assigned together in the same batch. When \beta \geq 1, we provide an optimal online algorithm; When 0\leq \beta < 1, we give a best possible online algorithm of competitive ratio 1+\alpha, where \alpha is the positive root of the equation \alpha^{2}+(1+\beta) \alpha+\beta-1=0.  We also provide a new lower bound on the competitive ratio for dense-algorithms, and present a best possible dense-algorithm matching this lower bound.

参考文献

Fu R Y, Tian J, Yuan J J. On-line scheduling on an unbounded parallel batch machine to minimize makespan of two families of jobs [J].  Journal of Scheduling, 2009, 12: 91-97.


Fu R Y, Cheng T C E,  Ng C T, et al. An optimal online algorithm for single parallel-batch machine scheduling with incompatible job families to minimize makespan [J].  Operations Research Letters, 2013, 41: 216-219.

Tian J, Cheng T C E, Ng C T, et al. Online scheduling on unbounded parallel-batch machines with incompatible job families [J]. Theoretical Computer Science, 2011,  412: 2380-2386.
 
Li W J, Yuan J J, Cao J F, et al. Online scheduling of unit length jobs on a batching machine to maximize the number of early jobs with
lookahead [J].  Theoretical Computer Science, 2009,  410: 5182-5187.
 
Zheng F F, Xu Y F, Zhang E. How much can lookahead help in online single machine scheduling [J].  Information Processing Letters, 2008, 106: 70-74.

Li W H, Zhang Z K, Yang S F. Online algorithms for scheduling unit length jobs on parallel-batch machines with lookahead [J].  Information Processing Letters, 2012,  112: 292-297.

Li W H, Yuan J J, Yang S F. Online scheduling of incompatible unit-length job families with lookahead [J]. Theoretical Computer Science,2014, 543: 120-125.

Zhang G C, Cai X Q, Wong C K, Online algorithms for minimizing makespan on batch processing machines [J]. Naval Research Logistics, 2001, 48:241-258.

 
文章导航

/