[1] 赵晓丽.多代理生产调度问题的理论研究[D].沈阳:东北大学,2015. [2] Zhang Z M, Wang X P, Su C, et al. Evolutionary game analysis of shared manufacturing quality synergy under dynamic reward and punishment mechanism [J]. Applied Sciences, 2019, 12(13): 6792-6792. [3] 许春安,李芳.云制造环境下对称型企业制造资源共享演化博弈分析[J计算机应用研究,2019, 36(11): 3315-3320, 3324. [4] 王成亮.网络协同制造下资源共享多目标调度优化[D].秦皇岛:燕山大学,2019. [5] 袁滢滢.基于资源共享的快递配送调度联盟优化机制研究[D].重庆:重庆交通大学,2020. [6] 郑斐峰,靳凯媛,宋沁容.考虑两阶段运输的加工资源共享调度策略[J东华大学学报(自然科学版),2022,48(3):114-120. [7] 王小丽,刘鹏,钢铁企业双代理调度问题的理论研究[D].沈阳:沈阳工业大学,2018. [8] Cheng T C E, Ng C T, Yuan J J. Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs [J]. Theoretical Computer Science, 2006, 362(1): 273-281. [9] Lee W C, Wang J Y. A scheduling problem with three competing agents [J]. Computers and Operations Research, 2014, 51: 208-217. [10] Agnetis A, Pacciarelli D, Pacifici A. Multi-agent single machine scheduling [J]. Annals of Operations Research, 2007, 150(1): 3-15. [11] Lee K, Choi B C, Leung J Y T, et al. Approximation algorithms for multi-agent scheduling to minimize total weighted completion time [J]. Information Processing Letters, 2009, 109(16): 913-917. [12] Wang D J, Yu Y G, Yin Y Q, et al. Multi-agent scheduling problems under multitasking [J]. International Journal of Production Research, 2020, 59(12): 1-31. [13] 陈秋宏,张新功. 带有固定区间的单机双代理可中断总误工问题[J]。运筹学学报,2019,23(1): 61-71. [14]崔同欣,夏倩,张新功.基于松弛工期的总加权误工单机双代理排序问题[J].运筹学学报(中英文), 2025,29(1):31-40. [15] 孙树栋,周新民,常昇博,含私有信息的多代理作业车间协商调度算法[J].机械工程学报,2022, 58(9):210-217. [16] Aminzadegan S, Tamannaei M, Rasti-Barzoki M. Multi-agent supply chain scheduling problem by considering resource allocation and transportation [J]. Computers and Industrial Engineering, 2019, 137: 106003. [17] Han B, Zhang W J, Lu X W, et al. On-line supply chain scheduling for single machine and parallel-machine configurations with a single customer: Minimizing the makespan and delivery cost [J]. European Journal of Operational Research, 2015, 244(3): 704-714. [18] Li K, Jia Z H, Leung J Y T. Integrated production and delivery on parallel batching machines [J]. European Journal of Operational Research, 2015, 247(3): 755-763. [19] Li F, Wu C H, Zhou L, et al. A model integrating environmental concerns and supply risks for dynamic sustainable supplier selection and job allocation [J]. Soft Computing, 2020, 25(1): 535-549. [20]高龙龙,韩文民.虚拟单元内外运输能力受限的异质并行机调度研究[J].运筹与管理,2023,32(8): 71-77. [21]邓超.混合分布估计算法求解加工-运输-装配三阶段集成调度问题[D].昆明:昆明理工大学,2021. [22]迟晓晨,基于改进粒子群算法的压铸自动化生产线调度问题研究[D].长春:长春工业大学,2021. [23]宫华,唐立新,并行机生产与具有等待时间限制的成批运输协调调度问题[J].控制与决策,2011, 26(6):921-924. [24】李昆鹏,马士华.ATO供应链中航空运输及并行机生产协调调度问题[J].系统工程理论与实践, 2007, 27(112):7-15. [25] Bertsekas D P. The auction algorithm: A distributed relaxation method for the assignment problem[J].Annals of Operations Research, 1998,14(1): 105-123. [26]曾程宽,刘士新,求解存在运输空间约束多单元协作调度问题的拍卖算法[J,控制与决策,2019, 34(4): 689-698. [27]刘婉君,张静文,刘万琳,基于拍卖机制的资源转移时间型动态分布式多项目调度[J中国管理科学,2022,30(8):117-129. [28] Liu Y Q, Sun S D, Wang X V. An iterative combinatorial auction mechanism for multi-agent parallel machine scheduling[J]. InternationalJournal of Production Research,2022,60(1): 361-380. [29]宋士兵,解振华.基于拍卖算法的联合作战装备维修保障任务分配模型研究[J].军事运筹与系统工程,2021,35(3):8-14. |