Abstract

The production capacity sharing problem was studied in this paper. Considering that the game is composed of a capacity provider and customers, in which the capacity provider and customers are self-interest, with different demands and different market relations. Nash bargaining theory was adopted to explore the sharing strategy of the production capacity. To be specific, the classic scheduling model and the asymmetric Nash bargaining model were combined to develop a production capacity sharing model, which was essentially a nonlinear integer program. To address the computational issue, a solving method based on Lagrangian relaxation was designed, and then, the bargaining results of production capacity sharing were given. Simulation analysis shows that the proposed algorithm performs well in most cases. It is found that when the capacity provider has a min-sum objective function, the capacity provider pays attention to the performance indicators of all customers, and the conflict between the capacity provider and customers are particularly significant. With the increase of bargaining power of the capacity provider, the capacity provider index is optimized, but the customer performance index becomes worse. However, when the bargaining power of the capacity provider is very strong, it will lead to the fluctuation of the overall efficiency of the system. Therefore, the game parties need to maintain a reasonable bargaining power.

Cite this article

Qiiong WU, Changjun WANG . Production capacity sharing bargaining based on Lagrangian relaxation[J]. Operations Research Transactions, 2024 , 28(2) : 93 -102 . DOI: 10.15960/j.cnki.issn.1007-6093.2024.02.007

References

1 工业和信息化部. 关于加快培育共享制造新模式新业态?促进制造业高质量发展的指导意见[EB/OL]. (2019-10-29)[2021-05-24]. https://www.miit.gov.cn/zwgk/zcwj/wjfb/zh/art/2020/art_8f82f9a4c4434ff79a5a9e4009cc4e68.html.
2 Pinedo M L . Scheduling: Theory, Algorithms, and Systems[M]. New York: Springer, 2012.
3 徐俊刚, 戴国忠, 王宏安. 生产调度理论和方法研究综述[J]. 计算机研究与发展, 2004, 2, 257- 267.
4 Baker K R , Smith J C . A multiple-criterion model for machine scheduling[J]. Journal of Scheduling, 2003, 6 (1): 7- 16.
5 Agnetis A , Mirchandani P B , Pacciarelli D , et al. Scheduling problems with two competing agents[J]. Operations Research, 2004, 52 (2): 229- 242.
6 Zhao Q L , Yuan J J . Bicriteria scheduling of equal length jobs on uniform parallel machines[J]. Journal of Combinatorial Optimization, 2020, 39 (3): 637- 661.
7 梁建恒, 薛含钰, 白丹宇, 等. 分支定界算法求解带有释放时间的单机双代理调度问题[J]. 运筹与管理, 2019, 28 (10): 83- 88.
8 Li H , Gajpal Y , Bector C R . A survey of due-date related single-machine with two-agent scheduling problem[J]. Journal of Industrial and Management Optimization, 2017, 13 (5): 1- 19.
9 Koutsoupias E, Papadimitriou C. Worst-case equilibria [C]//Annual Symposium on Theoretical Aspects of Computer Science, 1999: 404-413.
10 Qi X . A note on worst-case performance of heuristics for maintenance scheduling problems[J]. Discrete Applied Mathematics, 2007, 155 (3): 416- 422.
11 Nong Q Q , Guo S J , Miao L H . The shortest first coordination mechanism for a scheduling game with parallel-batching machines[J]. Journal of the Operations Research Society of China, 2016, 4 (4): 517- 527.
12 Bülbül K , ?en H . An exact extended formulation for the unrelated parallel machine total weighted completion time problem[J]. Journal of Scheduling, 2017, 20 (4): 373- 389.
13 Croce F D , Scatamacchia R , T'kindt V . A tight linear time $\frac{13}{12}$-approximation algorithm for the $P_2\|C_{\rm max}$ problem[J]. Journal of Combinatorial Optimization, 2019, 38 (1): 608- 617.
14 Kress D , Meiswinkel S , Pesch E . Mechanism design for machine scheduling problems: Classification and literature overview[J]. OR Spectrum, 2018, 40 (3): 583- 611.
15 王长军, 徐琪, 贾永基. 单机下异构任务调度的解性质研究[J]. 管理科学学报, 2015, 18 (7): 70- 81.
16 Cao Q , Jing Y , Zhao H V . Power allocation in multi-user wireless relay networks through bargaining[J]. IEEE Transactions on Wireless Communications, 2013, 12 (6): 2870- 2882.
17 Nasiri-Gheidari O , Marofi S , Adabi F . A robust multi-objective bargaining methodology for inter-basin water resource allocation: A case study[J]. Environmental Science and Pollution Research, 2018, 25 (3): 2726- 2737.
18 Dover O , Shabtay D . Single machine scheduling with two competing agents, arbitrary release dates and unit processing times[J]. Annals of Operations Research, 2016, 238 (1/2): 145- 178.
19 Xu Z J , Xu D H . Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion time[J]. Journal of Scheduling, 2018, 21 (4): 461- 482.
20 Hong J , Lee K , Pinedo M L . Scheduling equal length jobs with eligibility restrictions[J]. Annals of Operations Research, 2020, 285 (2): 295- 314.
21 王长军, 吴琼. 共享经济中基于排序博弈的单资源供需匹配效率研究[J]. 工业工程与管理, 2021, 26 (1): 165- 173.
22 Luh P B , Hoitomt D J , Max E , et al. Schedule generation and reconfiguration for parallel machines[J]. IEEE Transactions on Robotics and Automation, 2002, 6 (6): 687- 696.
23 Fonseca G B , Nogueira T H , Ravetti M G . A hybrid Lagrangian metaheuristic for the cross-docking flow shop scheduling problem[J]. European Journal of Operational Research, 2019, 275 (1): 139- 154.
24 轩华, 王薛苑, 李冰. 带批和离散机柔性流水车间问题的混合异步次梯度优化的拉格朗日松弛算法[J]. 计算机集成制造系统, 2020, 26 (4): 1001- 1010.
25 陶杰, 高岩. 疫情环境下价格导向的防护物资最优生产分配机制研究[J]. 运筹学学报, 2020, 24 (1): 13- 22.
Outlines

/